INEIGHT CASE STUDY

HEIDELBERG MATERIALS NORTH AMERICA PIONEERS DIGITAL COMMISSIONING WITH INEIGHT


Taking an industrial plant from the design stage through construction to commission and into service requires significant investment in infrastructure and equipment. For Heidelberg Materials North America’s new Mitchell, Indiana, plant, this process involved 67,000 technical drawings that needed to be reliably managed and shared between multiple parties.

By selecting InEight Document to store, manage, share, and control electronic documents, Heidelberg Materials was able to ensure efficiency, speed, transparency, and traceability throughout the process. As the commissioning team passes the baton to the operating team, the solution has created a valuable long-term knowledge base that will help maintain the plant in optimal working condition.

HEIDELBERG MATERIALS AT A GLANCE

Based in Irving, Texas, Heidelberg Materials North America is part of Heidelberg Materials, one of the world’s largest integrated manufacturers of building materials and solutions. At the center of our actions lies our responsibility for the environment. We are pioneers on the road to carbon neutrality and circular construction. We’re developing new, sustainable building materials as well as intelligent digital solutions.

SOLUTION BENEFITS:


  • Streamlining the management and sharing of a large and complex set of documents.
  • Enabling rapid retrieval of technical information during commissioning and beyond.
  • Delivering clarity, efficiency, and speed in support of a major engineering project.