INEIGHT CASE STUDY

OCL GROUP MAXIMIZES REVENUE RECOGNITION WITH INEIGHT


Faster reconciliations, enhanced efficiency, audit confidence

ABOUT OCL GROUP

OCL Group Inc. is a fully-integrated pipeline, construction, and maintenance contractor. Its core areas of business include construction, repair, and alteration of pressure piping for facilities and pipelines, fabrication, maintenance, civil earthworks, turnarounds, and shutdowns. The company is highly specialized in the area of tailings and hydro-transport piping construction and maintenance. With its specialization in fully-automated, semi-automated double jointing welding processes and strategically located pipe yards and facilities, OCL is well positioned to offer its clients welding solutions to lower cost, improve quality, and reduce operational risk.

OCL GROUP AT A GLANCE

Location: North America: Alberta, Canada

Industry: Heavy and civil engineering construction

Size: 500+ employees

InEight Products: • Billings

SUMMARY

OCL Group started out by managing billing using Excel, but as the company scaled, team members found it didn’t provide the level of control, flexibility, and smooth integrations they needed to support their growth and respond to client audits. Inconsistencies were slowing down the reconciliation process and increasing admin overhead. By adopting InEight Billings, OCL gained the flexibility to present consistent data with confidence, and tailor reports to meet client requirements. This has helped the company accelerate reconciliations, improve cash flow, and breeze through audits.

SOLUTION BENEFITS:


  • Faster reconciliations
  • Maximized revenue recognition

  • Lower administrative overhead
  • Audit confidence

NEXT PAGE >