OCL GROUP MAXIMIZES REVENUE RECOGNITION WITH INEIGHT


Faster reconciliations, enhanced efficiency, and audit confidence

OCL Group Inc. is a fully-integrated pipeline, construction, and maintenance contractor. Its core areas of business include construction, repair, and alteration of pressure piping for facilities and pipelines, fabrication, maintenance, civil earthworks, turnarounds, and shutdowns. The company is highly specialized in the area of tailings and hydro-transport piping construction and maintenance. With its specialization in fully-automated, semi-automated double jointing welding processes and strategically located pipe yards and facilities, OCL is well positioned to offer its clients welding solutions to lower cost, improve quality, and reduce operational risk.

OCL GROUP AT A GLANCE

LOCATION:

North America: Alberta, Canada

INDUSTRY

Heavy and civil engineering construction

EMPLOYEES

500+

INEIGHT PRODUCTS

InEight Billings

OCL Group started out by managing billing using Excel, but as the company scaled, team members found it didn’t provide the level of control, flexibility, and smooth integrations they needed to support their growth and respond to client audits. Inconsistencies were slowing down the reconciliation process and increasing admin overhead. By adopting InEight Billings, OCL gained the flexibility to present consistent data with confidence, and tailor reports to meet client requirements. This has helped the company accelerate reconciliations, improve cash flow, and breeze through audits.

SOLUTION BENEFITS:

Faster reconciliations

Maximized revenue recognition

Lower administrative overhead

Audit confidence

SEEKING BETTER CONTROLS FOR AN INTEGRATED WORKFLOW

Like many contractors, OCL Group initially used Excel to manage their billing. Though Excel is very simple and inexpensive, OCL Group found it didn’t provide the level of control and seamless integrations needed as the business grew, and the admin team scaled accordingly. As Jenna Hendrickson, Operations Services Lead at OCL Group explains: “We got big enough that it just made sense to have better controls in place. For example, with an Excel sheet, there’s no locking. We needed consistency and something to integrate our billing with our payroll exports, which was challenging with Excel.” Hendrickson says that when it was just one administrator and one payroll person, it wasn’t too burdensome, but when OCL Group started adding more resources, it became clear that they needed a more robust solution.

“We got big enough that it just made sense to have better controls in place. An Excel sheet doesn’t provide a lot of control.”

- Jenna Hendrickson, Operations Services Lead, OCL Group

“Having different versions in Excel can quickly turn into a big headache when you think you’re locked and then someone else makes an edit,” she notes. Inconsistencies were leading to a lot of back and forth, slowing down the reconciliation process, and increasing admin overhead. Plus, Excel could only take OCL Group so far as clients requested more tailored reporting.

INEIGHT DELIVERS FLEXIBILITY, CONTROL, INCREASED EFFICIENCY

After looking at other solutions, OCL Group chose InEight Billings, which they now use for data capture; payroll, the creation of labor, equipment, materials, services (LEMS); reporting; and many aspects of billing and invoicing. “As our Operations Services Lead, I coordinate administrative roles and responsibilities for the projects, and I also do billing for about half of our projects, so I'm utilizing InEight daily,” says Hendrickson. Hendrickson notes that she appreciates the level of flexibility that InEight Billings provides—particularly the ability to tailor fields and reports to match client requirements—and how well it supports their integrated administrative processes.

“We've looked at other programs in the past, but they don’t give us the same level of flexibility that we get with InEight Billings.”

- Jenna Hendrickson, Operations Services Lead, OCL Group

OCL’s current workflow involves using InEight Billings for time sheets, rate tables, project setup, work breakdown structures, daily reports, and locking transactions in Billings. Then the team exports the data to Eclipse for payroll management, and to Google to create specialized project invoices. “I couldn’t do my job without every feature that we use within Billings,” says Hendrickson. “If we’re doing time and materials work, we have the LEMS that we've generated in InEight, which the client signs, and then that becomes the backup for our invoices.” Billings has also been useful for getting new members of OCL’s growing admin team up-to-speed quickly. “The Billings test environment is really helpful because we can work in it without modifying our actual data. It’s great for training because we can still do our day-to-day work, and they can practice in an environment that won’t affect our actual data,” says Hendrickson.

FASTER RECONCILIATIONS, CONSISTENT, AUDIT-PROOF DATA

Billings has helped OCL Group complete reconciliations much faster, “with just a click of a button,” and it delivers a level of certainly and accuracy that boosts confidence as the company continues on its growth trajectory.

“I couldn't do my job without every feature that we use within InEight Billings.”

- Jenna Hendrickson, Operations Services Lead, OCL Group

“The number one thing for me is that we can lock out transactions and say this is done, this is billed, and no one can easily make changes. That way, when we’re audited, it’s easy for us to present the data that we’ve used because it’s consistent,” says Hendrickson. Billings has also helped OCL Group efficiently meet clients’ expectations for tailored reporting and auditing. “We can use Billings to quickly get our clients exports of exactly what they need in the format they require, without risk of error, and that’s a big win,” Hendrickson says. She shared an anecdote about one of the company’s biggest clients requesting five years of past billing data. “It’s so helpful when you can just easily pull something, especially when it's for a big client who has done several different projects over a five-year time period—and you know they’re looking for mistakes. InEight makes it so much faster and easier since the data is all in one place and we can be confident that it’s correct,” Hendrickson says.

ENHANCED ADMIN EFFICIENCY + CONFIDENCE IN THE NUMBERS

Billings has helped OCL Group take on a wide variety of projects with full confidence that the team is accurately capturing all contractually billable items and locking in the correct rates. It’s also providing the flexibility OCL Group needs to meet current client demands for detailed custom reporting, and respond to future client audits quickly and without fear. Summing up OCL Group’s experience with Billings, Hendrickson says: “We’ve grown so much as a company and have been using Billings for so long. It’s become a really big part of our day-to-day processes.”

“We can use InEight Billings to quicky get our clients exports of exactly what they need in the format they require, without risk of error, and that’s a big win.”

- Jenna Hendrickson, Operations Services Lead, OCL Group

GET PAID FASTER

Learn more about how InEight is helping contractors like OCL Group confidently execute major construction programs.

REQUEST A DEMO

ABOUT INEIGHT

InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight's solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes. For more information, follow InEight on LinkedIn or visit InEight.com. © 2026 InEight, Inc. All Rights Reserved