INEIGHT CASE STUDY:

QUANTA SERVICES

InEight Estimate has helped Quanta to reduce estimate-to-schedule cycle time from two days to two hours.

CONTINUOUS IMPROVEMENT IN ESTIMATING

With flexible and granular management of cost items, InEight Estimate helps Quanta to continuously refine estimates and increase their accuracy. Greer explains, “For example, when we are stringing conductor on a project, the terrain and working conditions in different sections of the line can vary significantly. If you just have one cost line item for stringing a conductor across six unique pulling sections with varying conditions, you’re going to struggle to understand the likely costs and durations. With the ability to split cost items, I can build one section, then adjust the crew makeup and productivity for the other sections depending on the actual requirements to perform the work in each area.”

He concludes, “Using the InEight solution has really streamlined our estimating process, significantly reducing the time to create, share, review and refine estimates. It’s an incredible time-saving tool. We can ask, ‘What happens if this takes seven days instead of five?’ and immediately see the impact.”

“Using the InEight solution has really streamlined our estimating process, significantly reducing the time to create, share, review and refine estimates. It’s an incredible time-saving tool. We can ask, ‘What happens if this takes seven days instead of five?’ and immediately see the impact.”

- Jody Greer, Director of Estimating and Project Controls at Quanta Energized Services

THERE IS A SOLUTION

Learn more about how InEight helps global construction and engineering companies create accurate estimates faster.

REQUEST A DEMO
< PREVIOUS PAGE

ABOUT INEIGHT

InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight's solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes. For more information, follow InEight on LinkedIn or visit InEight.com. © 2025 InEight, Inc. All Rights Reserved