INEIGHT SCHEDULE

SECURING PROJECT CERTAINTY

HOW A NEW APPROACH TO PLANNING MAKES YOUR SCHEDULE A STRATEGIC ASSET

You're not wrong: Capital construction scheduling is struggling to keep up as the industry changes fast. Even the most skilled schedulers face an uphill battle.

53%


53% of capital construction projects are delivered late

55%


55% are over budget 1

8.5%


Only 8.5% of infrastructure projects deliver on time 2

MORE INNOVATION = GREATER COMPLEXITY

Construction project complexity is increasing across the board. Extended timelines are often due to innovation in:

  • TECHNOLOGY
  • SUSTAINABILITY
  • DELIVERY METHODS
  • REGULATION
47%

Design-build projects will represent 47% of all spending by 20263

THE SCHEDULING STAFF CRISIS

So who will schedule all these complex projects?

17K

There are over 17,000 job openings for schedulers in the United States4

11%

Only 11% of all schedulers are under 305

24hr

Requires at least 24 hours of in-class training to learn just the basics of P66

68%

68% of organizations tag labor and recruitment challenges as a key disruptor for their business7

THERE'S ANOTHER WAY

Smart businesses know they need to rethink their scheduling approach, and now there's a software to match the business processes you need. InEight Schedule combines tried-and-true CPM capabilities with AI-driven tools to create dynamic, strategic schedules.

OUTDATED SCHEDULING TOOLS

Hours of training

Stagnant & rigid

Isolated process

Time-consuming

Likely to be ignored

INEIGHT SCHEDULE

Easy to use without extensive training

Iterate in real time

Incorporate team expertise

Templatize your planning process

Serves as a communication hub

BETTER SCHEDULING, BETTER BUSINESS

Re-engineering your scheduling process leads to benefits throughout the business, from the tactical to the strategic.

NO MORE SIDE SCHEDULES

When experts contribute to schedule creation, they're bought-in to the results.

MORE REALISTIC SCHEDULES

Start with as-built schedules for a validated starting point. Gather expert feedback to land on greater accuracy.

CONFIDENT DECISIONS, FASTER

Harness the rich data source of your conceptual detailed, and as-built schedules.

A REAL-TIME VIEW OF RISK

Integrated risk assessment tools and what-if modeling sidestep issues and support creative approaches.

ENABLE ALTERNATIVE CONTRACTING

Cloud-based transparency supports stakeholder collaboration and visibility for greater trust.

WHAT'S UNIQUE IN INEIGHT SCHEDULE

InEight Schedule stands out from other solutions with features that turn scheduling into a strategic asset for your business.

  • Collaborative markup tool
  • Cloud-based
  • Plans in context at all levels
  • Intuitive interface
  • Knowledge library
  • Practical AI tools
  1. https://ineight.com/annual-global-capital-projects-report/
  2. https://www.washingtonpost.com/transportation/2023/04/28/infrastructure-projects-time-budget/
  3. https://dbia.org/blog-new-design-build-research-shows-continued-growth-plus-opportunities-to-mitigate-market-challenges/
  4. https://www.zippia.com/project-scheduler-jobs/trends/
  5. https://www.zippia.com/project-scheduler-jobs/demographics/
  6. https://www.emerald-associates.com/training/oracle-primavera-canada/index.html#:~:text=How%20long%20does%20it%20take,the%20software%20will%20take%20longer.
  7. https://ineight.com/annual-global-capital-projects-report/

FOR BETTER PROJECT OUTCOMES, START WITH BETTER PROJECT PLANNING.

Find out how InEight Schedule can transform your scheduling and your business.

TALK TO AN EXPERT

ABOUT INEIGHT

InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight's solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes. For more information, follow InEight on LinkedIn or visit InEight.com. © 2026 InEight, Inc. All Rights Reserved