INEIGHT CASE STUDY
MAJOR TRANSPORT INFRASTRUCTURE AUTHORITY (MTIA)

ACHIEVING MORE WITH THE SAME RESOURCES
Many industries are currently struggling to attract and retain sufficient skilled employees, and this is certainly the case in civil engineering and construction. As the industry faces up to human resources shortages in key roles such as planners, schedulers, estimators, and cost engineers, it needs technology providers to boost the automation of repetitive, lower-value tasks, so that the existing skilled workforce can enjoy increased productivity and job satisfaction. “A lot of projects remain very manual, even in major tier-one organisations,” says the director. “Civil infrastructure lags behind pretty much every other industry in terms of digitisation; we need vendors to help us increase productivity and allow our people to work on higher-value tasks.”
He concludes: “Digital transformation isn’t easy. For us, the key to success has been getting executive input and support from the outset. Start with the senior executives and have a good business plan in place: the what, the why and the how. With a well-thought-out business plan, you’ll find it much easier to get key stakeholders on board and maximise the benefits of embracing digital ways of working.”

ABOUT INEIGHT
InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight's solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes. For more information, follow InEight on LinkedIn or visit InEight.com. © 2026 InEight, Inc. All Rights Reserved