INEIGHT CASE STUDY:
CCC GROUP

STANDARDIZATION, VISIBILITY, AND CONFIDENCE
By deploying InEight, CCC Group turned fragmented processes with spreadsheets into a scalable, data-driven project controls framework. Teams across the company now recognize the business value attached to their work, using consistent planning methods and tracking progress with the confidence of better visibility into everyday execution, as well as strategic metrics.
What was proven out on one high-pressure job in Indiana has become a company-wide, global success story—one that’s still unfolding.

ABOUT INEIGHT
InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight's solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes. For more information, follow InEight on LinkedIn or visit InEight.com. © 2026 InEight, Inc. All Rights Reserved