INEIGHT CASE STUDY:

OCEANAGOLD

OCEANAGOLD IS NOW SEEING A HIGHER LEVEL OF EFFICIENCY WITH GREATER DOCUMENT CONTROL.

InEight Document streamlines the process of capturing, controlling, accessing and tracking project documentation. This allows companies such as OceanaGold to create the controlled, secure and accessible environment necessary to run successful projects.

ARE YOU READY FOR A MORE COLLABORATIVE AND EFFICIENT APPROACH TO DOCUMENT CONTROL?

REQUEST A DEMO
< PREVIOUS PAGE

ABOUT INEIGHT

InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight's solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes. For more information, follow InEight on LinkedIn or visit InEight.com.