INEIGHT CASE STUDY:
WESTCONNEX

HEADING TOWARD PROJECT SUCCESS
Today, Sydney’s WestConnex project is set for completion in 2023 andas the final stages of the project draw to a close, Transurban reflects on successes achieved with InEight technology. When evaluating the most significant business benefits Transurban has received while using InEight Document, Lopez says, “For me, it’s the cradle-to-grave lifespan of the project system — from the inception of the project and the life of the project system throughout the delivery phase and the closure. Without even reaching completion, we’ve been able to manage over 350,000 documents that will live in the system and remain available for all stakeholders at the end of the project to continue for operations of the asset. That alone is a massive accomplishment that will continue to prove valuable for Sydney and the WestConnex project.”
“For me, it’s the cradle-to-grave lifespan of the project system — from the inception of the project and the life of the project system throughout the delivery phase and the closure. Without even reaching completion, we’ve been able to manage over 350,000 documents. That alone is a massive accomplishment”
-Jenny Jong, Senior Document Controller, WestConnex

ABOUT INEIGHT
InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight's solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes. For more information, follow InEight on LinkedIn or visit InEight.com. © 2026 InEight, Inc. All Rights Reserved